Floor Fastening - Telair Energy 2510G User's Operating Instruction And Installation Manual

Table of Contents

Advertisement

GB

4.2.2 Floor fastening

The package contains a drilling jig, which allows
the generator bearing surface to be prepared
quickly, fig. 7.
Place a spongy, heat-
resistant gasket around the outlet opening of
the exhaust pipe. The gasket height must
reach the bottom of the generator and has the
purpose of preventing hot air from spreading
inside the generator compartment.
The brackets of the generator must be moved in
order to fasten the Energy 2510 G on the
bearing surface.
On both sides, remove the hole plugs (fig. 8 ref.
1) and screw out the screws (fig. 8 ref. 2) in order
to remove the bracket (fig. 8 ref. 3).
Place the bracket (fig. 9 ref. 3) on the 4 holes
which were previously covered by the plugs
using the same screws (fig. 9 ref. 2) and apply
the hole plugs (fig. 9 ref. 1) in the seats which
previously housed the screws.
Vers. 001
Energy 2510 G
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents