St. Croix SCF-Revolution Installation & Operation Manual page 8

Multi-fuel furnace
Table of Contents

Advertisement

Clearances & Access for Service & Maintenance
Figure 3
FLOOR PROTECTION – When installing the furnace on a combustible floor, the furnace
should be installed on a non-combustible surface extending 16" in front of the unit and 8" on
either side of the fuel-loading and ash-removal doors. A listed stove board or any non-
combustible solid sheet material may be used as a spark arrestor.
RIGHT SIDE – Minimum clearance to combustibles on the right side of the furnace is 2"
ACCESS FOR SERVICE AND MAINTENANCE – The remaining clearances shown above
are required to allow access to components during service and maintenance.
SCF-Revolution Manual
8

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for St. Croix SCF-Revolution

Table of Contents