Paradyne FrameServer SLV 9520-ILM Installation Instructions Manual page 18

Hide thumbs Also See for FrameServer SLV 9520-ILM:
Table of Contents

Advertisement

Net RX
Net TX
5. If the DS3 source device has a variable line build out (LBO) setting, ensure that it is
matched to the cable length.
NOTE:
After connecting the network cable, wait about a minute to allow Auto-
Configuration a chance to discover the frame relay characteristics and DLCIs.
Verification Check:
Check the System ALM (Alarm) LED. Is it off? Check the Network LEDs. Are the TD
and RD LEDs blinking, and are the OOF, LOS, AIS, and YEL LEDs off?
— If yes, the network interface is set up correctly and is ready to pass data.
— If no, check that both ends of the network cable are properly seated, then verify
that the network physical options are configured correctly.
Main Menu
Check the LMI LED. Is it on?
— If the LMI LED is off for more than three minutes, check the System and Test
Status screen for error messages.
Main Menu
Refer to the
reasons for the messages and what can be done to resolve the problem.
1
2
Configuration
Status
System and Test Status
FrameSaver SLV Operations Guide (9000-A2-GB33)
3
4
5
Network
Physical
18
DS3
Network
Interface
00-16778
for possible

Advertisement

Table of Contents
loading

Table of Contents