SpectraLink Link 150 Installation And Operation Manual page 4

Wireless telephone system
Hide thumbs Also See for Link 150:
Table of Contents

Advertisement

SpectraLink Corporation
UL Information
This symbol on the nameplate means the product is listed by Underwriter's Laboratories, Inc. It
is designed and manufactured to meet rigid U.L. safety standards against X-radiation, fire,
casualty, and electrical hazards.
The following are statements required for UL certification, related to safety procedures that must be
adhered to during installation.
Follow these general precautions while installing telephone equipment:
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically designed for wet
locations.
Never touch uninsulated telephone wires or terminals unless the telephone line has been
disconnected at the network interface.
Use caution when installing or modifying telephone lines.
When installing Base Stations outside or in buildings other than the one containing the System Controller,
take the following precaution:
If wiring for a Base Station exits a building—whether to reach an outdoor Base Station location or to reach
a Base Station in another building—the wiring must be protected at both ends by a Quick Clip Fuse from
Illinois Tool Works, Linx Division, model number SCP-2X2. The Quick Clip Fuse replaces the bridging
clips on the 66 blocks for all four connections to the non-internal Base Station.
Page ii
Link 150 M2 Installation and Operation
08/11/99

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Link 150 and is the answer not in the manual?

This manual is also suitable for:

Link 150 2

Table of Contents