SMA SUNNY BOY 5000-US Installation Manual page 23

Pv inverter
Hide thumbs Also See for SUNNY BOY 5000-US:
Table of Contents

Advertisement

SMA America, LLC
AC Voltage Configuration
The following figures display the correct arrangement of the jumpers for the 240 V Delta system
configuration: Note the order in which the inverters are connected to the phases.
Configuration Examples for Jumpers with 240 V Delta, 120 V Stinger
Configuration Examples for Jumpers with 240 V Delta, Grounded
Inverter 3
Jumpers Settings
L2
L1
When using grounded 240 V or 208 V Delta grids
• Connect terminal L2 to the grounded phase.
SB50US-80US-IA-en-36
SB50US-80US-IA-en-36
23