Switch Panel Location:

Select a location in the interior of the coach that allows for easy
operator access.
All electric installations, systems, and equipment shall comply
with Article 551, Parts I and III through
as
well as the regulation of authorities having
jurisdiction and CSA Standard B139.

Switch Panel Mounting:

1. Cut out a 5" W x 1.25" H opening for the switch panel
plate. Reference Figure 35.
2. Once the switch panel has been completely wired, perma-
nently mount the switch panel in place.
3. Move both switches to an OFF position by pressing them
in a downward motion.

Switch Panel Wiring:

Figure 35
VI of NFPA 70,
®
© 2011 Aqua-Hot
675-D Installation Manual
S
ECTION
1. Run 16-gauge wires from the switch panel to the electronic
controller.
NOTE: It is recommended that the wire colors illustrated in
Appendix A be used when installing the switch pan-
els. This will ensure installation consistency, differen-
tiate between the separate switches and assist service
personnel with troubleshooting. Reference Appendix
B for proper wire-gauge sizing.
2. Strip and crimp insulated female terminals onto each wire
at the switch panel location.
NOTE: Be sure to attach "Jumper Wires" where necessary.
Reference Figure 36.
3. Connect all switch wires to the appropriate switch
connections as illustrated in Figure 36. Reference
Appendix A for additional wiring information.
4. Insert all switch wires into the appropriate terminal/switch
panel connection on the electronic controller. Reference
Appendix A. Reference Appendix A.
6: S
P
WITCH
ANEL
— Page 29 —

Advertisement

Table of Contents
loading

Table of Contents