About Fall prevention
Connect the reinforcement material or reinforcement angle to this
camera to prevent it from falling.
For the used safety cable, pay particular caution to the length,
strength, pull, material.
When the camera mounting plate is
removed.
Specifications
Operating temperature : –10 ˚C to 50 ˚C
Mass : Body : WB-S621U; 2.0 k˝, WB-S622U; 1.8 k˝
WB-S623U; 1.0 k˝
Ceiling Panel Assy : 37.4 ˝ (Same for
Extrnal dimensions
[Unit:mm(inches)] *Design and specifications are subject to change without notice.
WB-S621U
85(3 3/8)
ø140(5 1/2)
ø160(6 1/4)
is a Registered Trademark owned by Victor Company of Japan, Limited.
is a Registered Trademark in Japan, the U.S.A., the U.K. and many other countries.
© 2005 Victor Company of Japan, Limited
(Safety cable not included.)
Safety cable
(14 ˚F to 122 ˚F)
WB-S621U, WB-S622U
and WB-S623U)
4-ø6,5(4-ø 1/4)
(Ceiling Mount Hole)
Installing the Camera
Attach the camera to the camera mounting plate.
Ensure that the Front mark on the camera mounting plate aligns
with the Front mark on the camera.
For TK-C625U/E and VN-C625U, attach the ceiling panel assem-
bly to the camera mounting plate before installing the camera.
Mounting Hole A : For TK-C655E, TK-C676E, VN-C655U,
Mounting Hole B : For TK-C625U/E and VN-C625U
Mounting
Hole B
Mounting Hole A
Ceiling Panel
Assembly
Positioning Hole
Accessories (Same for WB-S621U, WB-S622U and
WB-S623U)
• Instructions ........................................................... 1
• Screw (M4 x 20 mm : For mounting camera) ........ 4
• Ceiling Panel Assy ................................................ 1
WB-S622U
332(13 1/8 )
ø160(6 1/4 )
WB-S623U
ø16 0(6 1/4)
TK-C205(A)U/E and TK-C205VP(A)U/E
Camera Mounting
plate
Mounting
Hole B
Front Mark
80(3 1/8 )
60(2 3/8 )
2-ø6(2-ø 1/4 )
(Wall Mounting Hole)
83,5(3 1/4)
4-ø4,5(4-ø 1/8)
(Ceiling Mount Hole)
Mounting
Hole A
2- R3
(2- R 1/8 )
Printed in China
LWT0267-001A-C
Need help?
Do you have a question about the Ceiling Bracket WB-S623U and is the answer not in the manual?
Questions and answers