Wb-S622U Wall Mount; Wb-S623U Ceiling Bracket - Jvc Ceiling Bracket Wb-S623U Instructions

Jvc pendant mount, wall mount, ceiling bracket instructions
Table of Contents

WB-S622U Wall Mount

When a hole is not
made in the wall
Cover
Cover Mounting
Groove
Screw
1.
Safety
cable
3.
Camera
Mounting Plate
Cables
2.
Ceiling Panel Assy
(for attaching
TK-C625U/E
Screws
and VN-C625U)
(3 locations)
6.
Connect the cables.
Connect cables to the camera. For details, please refer to "INSTRUCTIONS" section of the camera in use.
7.
Attach the camera's ceiling mount. (Not applicable to TK-C205(A)U/E and TK-C205VP(A)U/E)
Attach the camera's ceiling mount to the camera mounting plate using the 4 screws (M4 x 20 mm) supplied with the wall mount. Ensure that the
Front mark on the camera mounting plate aligns with the Front mark on the ceiling mount.

WB-S623U Ceiling Bracket

Reinforcement
Angle
2.
Rear Mark
Top cover
C a m e r a
Mounting
Plate
Ceiling Panel Assy
(for attaching
TK-C625U/E
Protruding
and VN-C625U)
Part
6.
Connect the cables.
Connect cables to the camera. For details, please refer to "INSTRUCTIONS" section of the camera in use.
7.
Attach the camera's ceiling mount. (Not applicable to TK-C205(A)U/E and TK-C205VP(A)U/E)
Attach the camera's ceiling mount to the camera mounting plate using the 4 screws (M4 x 20 mm) supplied with the ceiling bracket. Ensure that
the Front mark on the camera mounting plate aligns with the Front mark on the ceiling mount.
Rear Mark
Top cover
Front Mark
5.
Protruding
Part
Ceiling Panel
Assembly
Positioning Hole
Safety cable
Cables
1.
When a hole is not
made in the ceiling
Cap
3.
Front Mark
Ceiling Panel
5.
Assembly
Positioning Hole
Screws
(3 locations)
1.
Make a hole
To route cables through the wall, make a hole of
2.
Route the safety cable and other cables
Open the cover and route the safety cable and other cables through this wall mount.
Please refer to "About Fall Prevention" for procedures to install the safety cable.
When a hole is not made in the wall, route the cables pulled to the wall stand
through the groove of the Wall Mount.
CAUTION
The camera may drop or images on the screen may appear shaky if the ceiling
material is not strong enough. In this case, reinforce using a reinforcement materials.
3.
Attach the wall mount to the wall
Attach the wall mount to the wall using 4 bolts (M5).
4.
Connect the safety cable.
Upon removing the camera mounting plate, attach the safety cable (not
supplied) to the interior of the top cover using the M3 screw. (Refer to "About
Fall Prevention".)
When attaching the camera mounting plate, ensure that the Front mark on the camera
mounting plate is facing a direction opposite to the Rear mark on the top cover.
5.
Install the ceiling panel assembly (for attaching TK-
C625U/E and VN-C625U)
To install, align the protruding part of the ceiling panel assembly with the ceiling panel
assembly positioning hole near the Front mark of the camera mounting plate.
Ensure to tighten the screws (3 locations) assembled to the ceiling panel assembly.
NOTE
The screws are assembled to the ceiling panel assembly in such a way that
they will not come off.
1.
Make a hole in the ceiling.
To route cables through the ceiling, make a hole of 30 mm ( 1 1/8") in the ceiling.
2.
Route the safety cable and other cables
Route the safety cable and other cables through the ceiling bracket. Please
refer to "About Fall Prevention" for procedures to install the safety cable.
When a hole is not made in the ceiling, route the cables through the hole at
one side of the Ceiling Bracket. Remove the cap covering the hole before
routing the cables through.
CAUTION
The camera may drop or images on the screen may appear shaky if the ceiling
material is not strong enough. In this case, reinforce using a reinforcement materials.
3.
Mount the ceiling bracket to the ceiling.
Mount the ceiling bracket to the ceiling using 4 M4 screws.
4.
Connect the safety cable.
Upon removing the camera mounting plate, attach the safety cable (not supplied)
to the interior of the top cover using the M3 screw. (Refer to "About Fall Prevention".)
When attaching the camera mounting plate, ensure that the Front mark on the camera
mounting plate is facing a direction opposite to the Rear mark on the top cover.
5.
Install the ceiling panel assembly (for attaching TK-
C625U/E and VN-C625U)
To install, align the protruding part of the ceiling panel assembly with the ceiling panel
assembly positioning hole near the Front mark of the camera mounting plate.
Ensure to tighten the screws (3 locations) assembled to the ceiling panel assembly.
NOTE
The screws are assembled to the ceiling panel assembly in such a way that
they will not come off.
30 mm (
1 1/8") in the wall.
Table of Contents
loading
Need help?

Need help?

Do you have a question about the Ceiling Bracket WB-S623U and is the answer not in the manual?

This manual is also suitable for:

Wb-s622uWb-s621u

Table of Contents