Labels on tool
The following pictograms are shown on the tool:
:
Warning! To reduce the risk of injury, the user must
read the instruction manual.
Additional safety instructions for batteries and
chargers
Batteries
Never attempt to open for any reason.
u
Do not expose the battery to water.
u
Do not expose the battery to heat.
u
Do not store in locations where the temperature may
u
exceed 40 °C.
Charge only at ambient temperatures between
u
10 °C and 40 °C.
Charge only using the charger provided with the tool.
u
When disposing of batteries, follow the instructions given
u
in the section "Protecting the environment".
Chargers
Use your Black & Decker charger only to charge the
u
battery in the tool with which it was supplied. Other
batteries could burst, causing personal injury and damage.
Never attempt to charge non-rechargeable batteries.
u
Have defective cords replaced immediately.
u
Do not expose the charger to water.
u
Do not open the charger.
u
$
Do not probe the charger.
u
+
The charger is intended for indoor use only.
-
Read the instruction manual before use.
The charger automatically shuts off if the ambient
temperature becomes too high. As soon as the
ambient temperature has cooled down, the charger
j
will resume operating.
Charge only at ambient temperatures between
y
10 °C and 40 °C.
Charging
(Original instructions)
Electrical safety
#
Your charger is double insulated; therefore no earth
wire is required. Always check that the mains
voltage corresponds to the voltage on the rating
plate. Never attempt to replace the charger unit with
a regular mains plug.
If the supply cord is damaged, it must be replaced by the
u
manufacturer or an authorised Black & Decker Service
Centre in order to avoid a hazard.
Overview
1. On/off switch
2. Forward/reverse slider
3. LED light
4. Bit holder
5. Pivot release slider
Fig. A
6. Charger
7. Charger connector
8. Charging indicator
9. Charging base
Assembly
Fitting and removing a screwdriver bit (fig. B)
This tool uses screwdriver bits with a 1/4" (6.35 mm)
hexagonal shank.
To fit a bit, insert the bit shaft into the bit holder (4).
u
To remove a bit, pull the bit shaft out of the bit holder (4).
u
Use
Before first use, the battery must be charged for 14 hours.
u
The battery needs to be charged before first use and
u
whenever it fails to produce sufficient power on jobs that
were easily done before. When charging the battery for
the first time, or after a prolonged storage, it will only
accept an 80% charge. After several charges and
discharge cycles, the battery will attain full capacity.
Place the tool on the charging base whenever it is not in use.
u
Charging the battery (fig. A)
Place the tool on the charging base (9).
u
Insert the connector (7) into the charging base.
u
Plug in the charger (6).
u
Leave the tool connected to the charger for 8 - 10 hours.
u
The red light illuminates when the unit is on charge and will
stay red as long as there is power to the charger. The red light
will not go off to indicate a full charge.
ENGLISH
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cordless screwdriver

Table of Contents