Site Preparation; Package Contents; Features - Motorola AP-621 Series Installation Manual

Access point
Hide thumbs Also See for AP-621 Series:
Table of Contents

Advertisement

1.3 Site Preparation

Consult your site survey and network analysis to determine specific equipment placement,
power drops etc.
Assign installation responsibility to the appropriate personnel.
Identify and document where all installed components are located.
Ensure adequate, dust-free ventilation to all installed equipment.
Prepare Ethernet port connections.
Verify cabling is within the maximum 100 meter allowable length.

1.4 Package Contents

The access point ships with the following:
One AP-621 Series access point
Installation Guide (This Guide)
Rubber Wall Mount Spacers (4)
LED light pipe and badge
Wall mount screw and anchor kit

1.5 Features

One RJ-45 console connector
One RJ-45 Ethernet connector
LED Indicators
Safety wire tie point
Wall mount slots
Clips for suspended T-Bar mounting
DC power connector
An AP-621 Series access point has one RJ-45 connector supporting an 10/100/1000 Ethernet port
connection and requires 802.3af compliant power from an external source.
The access point contains runtime firmware which enables the unit to boot after either a power up
or a watchdog reset. The runtime firmware on the access point can be updated via the Ethernet
interface.
Introduction
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents