2. Technical data

2.1. EKOSTER 2 – technical data
1. Temperatures range
2. Temperatures settings
3. Pump temperatures range
4. Blow-through settings
5. Hysteresis
6. Input power:
7. Voltage AC
8. Input volatge
9. Fan power in percentages % x 10
10. Relative air temperature
11. Protection class
12. Insulation class
13. Ambient temperature
14. Disconnection type
15. Electric protection
2.2. EKOSTER 2 – installation recommendations
1. Controller is adjusted to cooperate with solid fuel boilers.
2. Controller must be installed by qualified person.
3. Controller cannot work at temperatures higher than 40°C.
4. Controller should be protected against water flooding and steam condensation.
5. Controller should be installed and used according to handling rules with electric equipment.
6. Fuse burning as a result of wrong pump connection is not considered as a warranty matter.
7. It is recommended to check controller's settings before lightning up of the boiler.
8. Controller is equipped with two 1,25 A fuses
-9 °C +99 °C
+60 °C do +97 °C
+65 °C do +90 °C
work time
pause
Blow-through turn off
od 2 °C do 9 °C
fan
pump
230 V AC, 50 Hz
275 VA
(setting range 30 % to 100 %)
≤95 %
IP 40
I
0-40 °C
full
2 x 1.25 A (fusible)
0-90 seconds
1-15 minutes
P-0
100 W
100 W
15