STEP 2. Attaching the Upper Control Frame to the Main Frame
1. The first pilot wire and the cable line passes through the frame on the control tube, then on the
control pedestal (B) assembly in frame group (C), bears again afterward the blue color falls receives
in the steamed bread hexagonal screw (a) and spring washer (b) puts down China to take charge of
(c), like chart insertion locking localization then.
7
2010/2/26 Ver1.0+V1.0