Powering On the System

This section covers the procedures for cabling and powering on the system for the
first time. You must complete the following three procedures in consecutive order to
correctly power on the system.
"Connecting the Grounding Cable of the Base Cabinet" on page 22
"Connecting the Power Cables" on page 24
"Powering On the System" on page 27
Note – If you want to enable the system for lights-out management, which allows
you to perform a remote partial system shutdown, go to "Preparing the System for
Remote Power" on page 80.

Required Tools

The following tools are required to perform the tasks in this section:
Keys for key switch (shipped with the system)
Phillips screwdriver
Connecting the Grounding Cable of the Base
Cabinet
You must connect the grounding cable to either a grounding post or something
attached to a grounding post. The system is designed to work with single-phase
power systems that have a grounded neutral conductor.
1. Open the front and back doors of the system cabinet.
2. Locate the key switch at the bottom of the front panel (
22
Sun StorEdge 6920 System Getting Started Guide • May 2004
).
FIGURE 2-11