Framing and Finishing
1.
Choose unit location.
2.
Frame in fireplace with a header across the top. It is important
to allow for finished face when setting the depth of the frame.
See Figure 10B.
3.
Attach fireplace to frame using nailing flange. Preset depth to
suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
NOTICE: Fireplace must mount flush to facing material. If facing
material requires more depth than 3/4", mark and drill two 1/8"
holes into fireplace side at appropriate depth. Bend standoff
tabs as needed to move fireplace flush with facing material.
See Figure 10A.
4.
Use eight 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in nailing flange and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of nailing flange to determine final depth.
Vent Pipe Clearance
Note: Maintain one inch of clearance around top vent pipe. See
Figure 11. For rear vent, maintain a minimum 1" clearance to the
bottom and sides of the vent, and 3" clearance to combustibles
above the vent pipe. See Figure 12.
Figure 10A
Figure 10B
31455-4-1113

INSTALLATION

Figure 11 - Top Vent
Figure 12 - Rear Vent