Mitsubishi Electric FR-A700 Instruction Manual page 64

Hide thumbs Also See for FR-A700:
Table of Contents

Advertisement

<Selection method of speed control>
Speed control is exercised to match the speed command and actual motor speed.
Perform secure wiring. (Refer to page 31.)
Set the motor and encoder. (Pr. 71, Pr. 359, Pr. 369)
Set the motor capacity and the number of motor poles
Select a control method. (Refer to page 57.)
Set the run command. (Refer to page 74.)
(Refer to section 4 of
As required
· Perform offline auto tuning. (Pr. 96) (refer to page 62).
· Select online auto tuning. (Pr. 95) (refer to page 66).
· Easy gain tuning (refer to page 67)
· Manual input speed control gain adjustment (refer to page 69)
CAUTION
⋅ Speed command setting range is 0 to 120Hz for vector control.
⋅ The carrier frequencies are selectable from among 2k, 6k, 10k, 14kHz for vector control.
(2k and 6kHz for the 75K or more)
Mount the FR-A7AP.
Set Pr. 71 Applied motor, Pr. 359 Encoder rotation direction and Pr. 369
Number of encoder pulses according to the motor and encoder used.
(Refer to page 33.)
(Pr. 80, Pr. 81) (Refer to page 57.)
Set the motor capacity (kW) in Pr. 80 Motor capacity and set the number
of motor poles (number of poles) in Pr. 81 Number of motor poles. (V/F
control is performed when the setting is "9999" (initial value).)
Make speed control valid by selecting "0" (speed control), "2" (speed-
torque switchover), or "4" (speed-position switchover) for Pr. 800.
Select the start command and speed command.
(1) Start command
1)Operation panel: Setting by pressing
operation panel
2)External command: Setting by forward rotation or reverse
rotation command (terminal STF or STR)
(2)Speed command
1)Operation panel: Setting by pressing
2)External analog command (terminal 2 or 4) :
Give a speed command using the analog signal input to
terminal 2 (or terminal 4).
3)Multi-speed command:
The external signals (RH, RM, RL) may also be used to give
speed command.
Set the torque limit. (Pr. 810)
Instruction Manual (applied).)
Test run
Before operation
/
of the
of the operation panel
59
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents