Yamaha PZ50W Service Manual page 193

Yamaha motorcycles service manual
Hide thumbs Also See for PZ50W:
Table of Contents

Advertisement

CAMSHAFTS
Assembly steps:
• Install the timing chain tensioner spring, timing
chain tensioner spring seat, and timing chain
tensioner rod 1.
• Squeeze the timing chain tensioner clip 2, and
then push the timing chain tensioner rod 3 into
the timing chain tensioner housing.
NOTE:
Do not release the timing chain tensioner clip while
pushing the rod into the housing, otherwise the rod
may be ejected.
• Hook the clip 4 to the timing chain tensioner
rod 3.
NOTE:
Hook the timing chain tensioner rod pin 5 to the
center of the clip 4. After the installation, check
that the clip 4 can come off by its own weight by
pushing the timing chain tensioner rod 3 at the
position of installation.
12. Inspect:
• All parts
Damage/wear → Replace the defective
part(s).
5-24
ENG

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pz50mwPz50gtwPz50vtmPz50fxwPz50mpw

Table of Contents