Ld series infrared tube heater
Table of Contents

Advertisement

3.0
Installation
Hanger Placement and Suspension
Prepare mounting surface, if necessary weld blocks, drill holes (see figure 3.5).
3
NOTE: The burner control box and radiant tubes should be in straight alignment and level.
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
4
Attach and close S-hook (P/N: S-Hook) and #1 double-loop chain (P/N: THCS) to anchor. Check that
5
it is securely attached. NOTE: Threaded rod and turnbuckles may be used.
Attach hangers to chains. Adjust chain lengths until radiant tubing is level and equal weight distribution
6
is achieved. Chains must be straight up and down. Do not install chains at an angle as this can result
in tube warpage or separation.
Figure 3.5
Mounting the Hangers
I-Beam
3
Beam Clamp
4
Threaded Rod
6
Threaded Rod
5
and Turnbuckle
Concrete Beam
3
Screw Hook
4
Screw hook
with Locknut
and Washer
Chain
6
14
I-Beam
3
Beam Clamp
4
S-Hook and
5
#1 Double-Loop Chain
Chain
6
Wood Beam
3
4
Chain
6
LD
Series