For Ice Energy Engineer Or Approved Sub Contractor; Securing The Unit To The Floor - Mitsubishi Electric Ecodan Installation Manual

Table of Contents

Advertisement

For Ice Energy Engineer or approved Sub Contractor

Securing the unit to the floor

The unit should be mounted on anti-vibration pads, and bolted to the floor using M10 bolts as shown
below.
EcoDan Installation Manual Version 1.0 (26/01/09)
Ice Energy Heat Pumps Ltd © 2008
- 10 -

Advertisement

Table of Contents
loading

Table of Contents