Ecodan Installation Manual
EcoDan Installation Manual Version 1.0 (26/01/09)
Ice Energy Heat Pumps Ltd © 2008
- 1 -

Advertisement

Table of Contents
loading

Summary of Contents for Mitsubishi Electric Ecodan

  • Page 1 Ecodan Installation Manual EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 1 -...
  • Page 2: Table Of Contents

    For The Installer ............................7 Specifications ............................7 Installation Process (also see Mitsubishi Manual) .................. 9 Finding a suitable position for the EcoDan....................9 For Ice Energy Engineer or approved Sub Contractor................10 Securing the unit to the floor........................10 Internal Plumbing...........................
  • Page 3: Important Information

    (see page 22) Ensure that this manual is left with the householder after installation. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 3 -...
  • Page 4: For The User

    It harvests renewable, low grade energy from the outdoor air and upgrades this into useful heat to supply a home with hot water and heating. For every 1kW of electricity fed into Ecodan, you will get at least 3kW of heating energy.
  • Page 5: Maintenance

    Please consult the heating system installers as to any recommended maintenance requirements. Safety valves fitted to the hot water and central heating systems should be checked annually. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008...
  • Page 6: Components

    Heating System pressure & safety kit System Pump 1 x 15/60 2 x 22mm zone valves X500 antifreeze (20ltrs) 2 x 22mm full bore isolation valves EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 6 -...
  • Page 7: For The Installer

    For The Installer Specifications Cylinder Cylinder Capacity Height Diameter Weight (full) AUI 180 1281 AUI 210 1469 AUI 250 1719 EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 7 -...
  • Page 8 EcoDan 5kW EcoDan 9kW EcoDan 14kW EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 8 -...
  • Page 9: Installation Process (Also See Mitsubishi Manual)

    Installation Process (also see Mitsubishi Manual) Finding a suitable position for the EcoDan The unit must be bolted into place on a stable platform. The unit must also have free air flow as per the diagram below. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd ©...
  • Page 10: For Ice Energy Engineer Or Approved Sub Contractor

    Securing the unit to the floor The unit should be mounted on anti-vibration pads, and bolted to the floor using M10 bolts as shown below. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 10 -...
  • Page 11: Internal Plumbing

    Internal Plumbing The EcoDan will be installed onto a standard Honeywell S-Plan system. For details on the installation of hot water cylinder please refer to the manufactures literature include in packaging. The only additions to this are a Boiler Buddy and Flow Setter, seen on the following pages.
  • Page 12 1 ¼” BSP fittings. 2 x pump unions with isolators are used to fit the Boiler Buddy to the return pipe. (fittings not supplied) EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 12 -...
  • Page 13 Ice Energy can supply Sentinel X500 anti-freeze. Please contact us for more information. More information on Sentinel X500 is available later in this manual. (see pages 19,20) EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008...
  • Page 14: Internal Wiring

    Power should be isolated locally within 1.5 metres, minimum 3mm contact gap in isolator  An RCD (residual current device) should fitted in the supply to the Ecodan this should have a tolerance of 30mA or more The Honeywell S-Plan system will have to be wired to the Honeywell wiring centre as per the instructions included.
  • Page 15: Mitsubishi Flow Temperature Controller (Ftc)

    In a Water Heating mode the FTC will allow the Ecodan to work with leading brands of water storage tanks. It is, however, important to consider that the overall performance of the system in Water...
  • Page 16: Detailed Honeywell Wiring Diagram

    EcoDan Main Supply The main supply for the EcoDan should be installed to the exterior wall within 1m of the EcoDan. The supply should terminate at a waterproof isolator, and should be to the right hand side of the unit.
  • Page 17 Maximum Starting Current 5 Amp 14 KW Circuit Breaker size 40 Amp Cable size Maximum Running Current 35 Amp Maximum Starting Current 14 Amp EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 17 -...
  • Page 18 Domestic systems: All small & microbore domestic 6 litres/kW installations Allow an additional 10% (multiply by 1.1) for open vented systems of all types. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 18 -...
  • Page 19: Sentinel X500

    The information provided overleaf enables compliance with the Control of Substances Hazardous to Health Regulations Full Material Safety Data Sheets are available upon request. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 19 -...
  • Page 20: Technical Specification

    Eye Exposure: Rinse immediately with plenty of water. Seek medical attention. Ingestion: Rinse mouth with water. Do NOT induce vomiting! Seek medical attention.   EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 20 -...
  • Page 21: Commissioning

    If the house is newly built and ‘wet’ then the heat pump will not be able to provide enough heat to dry it out. In this case additional heat sources/dehumidification will be required. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008...
  • Page 22 EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 22 -...
  • Page 23: Pre-Commissioning Check List

    Pre-Commissioning Check List EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 23 -...
  • Page 24 If economy 7 tariffs are available then the initial hot water heat up and as much space heating as possible should programmed to coincide with these times. EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 24 -...
  • Page 25: Photos

    Photos First fix completed Rear of unit showing lagged pipework EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 25 -...
  • Page 26 Typical finished installation EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 26 -...
  • Page 27 EcoDan Installation Manual Version 1.0 (26/01/09) Ice Energy Heat Pumps Ltd © 2008 - 27 -...