Ferroli Domina 80 E Installation, Service And User Instructions Manual page 20

Copper wall-mounted combination, gas fired boiler for central heating and domestic hot water production, fan assisted, room sealed compartment, electronic flame ignition and control
Table of Contents

Advertisement

4. Place wall plate on outer flue ensuring it is level. Mark and drill four holes, two top, for expanding bolts
and two bottom for plugs and screws. Fix plate to wall with the square gasket between the wall and
the plate use the large diameter washers for the bolts and screws.
Circular Gasket
5. Through plate into air tube, drill two holes and fix in place using two self tapping screws M4 x 6mm
long.
20
DOMINA 80 E
Square Gasket
Fig. 16d
Fig. 16e

Advertisement

Table of Contents
loading

This manual is also suitable for:

Modena 102

Table of Contents