Installing The Power Button Board And Switch Board - Toshiba Satellite L350 Maintenance Manual

Hide thumbs Also See for Satellite L350:
Table of Contents

Advertisement

4 Replacement Procedures
Install the Power Button Board and Switch Board
Install the Power Button Board and Switch Board according to the following procedures and
Figures 4-33.
1. Connect the switch board flat cables to CN1 on the switch board.
2. Seat the switch board in the correct position.
3. Secure the switch board with two M2x3 black flat head screws.
4. Seat the Power button board in the correct position.
4. Secure the volume board with two M2x3 black flat head screws.
4-56
Satellite L350/ Satellite Pro L350/ EQUIUM L350/ SATEGO L350 Maintenance Manual
4.18 Power Button Board and Switch Board

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite pro l350Equium l350Satego l350

Table of Contents