Andrew 3.7-Meter Earth Station Antenna Installation And Operation Manual page 65

Andrew corporation 3.7-meter earth station antenna installation, operation and maintenance
Table of Contents

Advertisement

Figure 3-53b: Subreflector Assembly
Step 3
Attach the angle clips (P/N 49187) around the reflector perimeter at the indicated posi-
tions using the appropriate hardware as noted in Figure 3-53c.
Figure 3-53c: Subreflector Assembly
Installation Procedures
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es37mpkEs37mpjk

Table of Contents