Andrew 3.7-Meter Earth Station Antenna Installation And Operation Manual page 54

Andrew corporation 3.7-meter earth station antenna installation, operation and maintenance
Table of Contents

Advertisement

Step 3
Install the supplied sealant backing rod material around entire circumference of the
mounting ring/enclosure mating surfaces as shown in Figure 3-40.
Step 4
Securely tighten the enclosure mounting hardware using the A-325 tensioning proce-
dure.
Step 5
Apply the supplied RTV sealant around the outer perimeter of the reflector-mounting
ring/enclosure assembly junction as shown in Figure 3-41.
You have now completed the assembly of the enclosure and have mounted the enclo-
sure to the reflector. Proceed to the next page for instructions on mounting the reflector
to the ground mount assembly.
Figure 3-40: Backing Rod Assembly
Figure 3-41: RTV Sealant
54
Installation Procedures

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es37mpkEs37mpjk

Table of Contents