Andrew 3.7-Meter Earth Station Antenna Installation And Operation Manual page 44

Andrew corporation 3.7-meter earth station antenna installation, operation and maintenance
Table of Contents

Advertisement

Step 3
Pry the short ends of the crate off by using a pry bar and hammer as shown in Figure 3-30c.
NOTE: Notice that the parts of your order are boxed and banded to your crate. Remove
these boxes by snipping the banding with tin snips.
Step 4
Take the front, long side of the crate off.
Step 5
Unbolt the reflector halves from the bottom of the crate. DO NOT PRY.
Step 6
Find a flat area for the reflector assembly. The area must be large enough for the reflec-
tor halves to lay adjacent to each other. Pieces of wood (such as 2" X 4" pieces) can be
positioned to provide a level surface for the reflector to rest on, which will prevent
scratching of the reflector.
Note: This area must be level or there may be problems in correctly aligning the reflector.
Figure 3-30b: Export Pack
Figure 3-30c: Unpacking
44