Step 1
Step 2
The following steps provide the procedure for installing the reflector to the mount with-
out the use of a crane.
Route one rope tag line through two consecutive holes at the top of the reflector in the
torsion box assembly.
Place foam blocks (provided as packaging material) on the bottom lip of the reflector
(between the ground mount and the reflector) to prevent the reflector from scraping the
ground as it is lifted.
Figure 3-44c: Crane Lift
57