Andrew 3.7-Meter Earth Station Antenna Installation And Operation Manual page 20

Andrew corporation 3.7-meter earth station antenna installation, operation and maintenance
Table of Contents

Advertisement

Step 3
Lift the ground mount assembly into an upright position. In the absence of a crane, it is
recommended that a minimum of two people assist in the lifting of the mount assembly
as shown in Figure 3-6a and Figure 3-6b.
Figure 3-6a: Manual Lift
Figure 3-6b: Manual Lift
20
Installation Procedures

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es37mpkEs37mpjk

Table of Contents