CITROEN C5 Handbook page 47

Private cars
Hide thumbs Also See for C5:
Table of Contents

Advertisement

SPECIAL FEATURES : TIGHTENING TORQUES (m.daN)
Engine : XFZ
- 8 Crankshaft bearing
- Clean the threads of the screws with a brush.
- Refit the screws with a coating of grease
( MOLYKOTE G RAPID PLUS ).
- Check that the 8 centring pins are in place.
Maximum length under the heads of the screws :
- M11 = 131.5 mm.
- M8 = 119 mm.
- Pre-tighten the M11 screws to 3 m.daN ± 0.3 (1 to 8 ).
- Pre-tighten the M8 screws to 1 m.daN ± 0.1 (A to H).
- Tighten the M6 screws to 1 m.daN± 0.1 (a to m).
- Slacken the M11 and M8 screws (screw by screw).
- Tighten the M11 screws to 3 m.daN ± 0.3 (1 to 8).
- Tighten the M8 screws to 1 m.daN ± 0.1 (A to H).
B1BP1GYD
44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2002 c5-synergie

Table of Contents