Before Installation; Installation Diagram - GReddy e-01 Instruction Manual

Multi display controller
Hide thumbs Also See for e-01:
Table of Contents

Advertisement

Before Installation

• Make sure the engine has cooled down before working under
the hood.
• Take the key out of the ignition switch and disconnect the
negative terminal of the battery.
• Before mounting the Valve unit and the Pressure sensor,
be sure the supplied vacuum hose is long enough to reach
them.
• Locate the actuator/wastegate, factory boost controlling
solenoid valve, and fuel pressure regulator or true vacuum
source before installation.

Installation Diagram

Display unit
Display unit
Center unit
Center unit
Pressure sensor
Pressure sensor
Engine
Engine
Fuel regulator
Fuel regulator
Intercooler
Intercooler
Controller
Controller
Option (yellow)
RPM (brown)
Ground (black)
Power 12V (red)
Turbo
Turbo
Actuator
Actuator
Air cleaner
Air cleaner
Valve unit
Valve unit
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents