Power up the server (on page 16).
10.
Full-height tape drive
For clarity, the following illustrations include option cabling only.
To install the component:
Power down the server (on page 16).
1.
Remove the bezel (on page 17).
2.
Remove the access panel (on page 18).
3.
Remove the applicable media bay blanks
4.
Disengage the two wire supports inside the half-height drive bays.
5.
Install the tape drive:
6.
Open the upper and lower wire retainers.
a.
Install the full-height tape drive.
b.
("Remove a media bay
blank" on page 19).
Hardware options installation 34