Assembly - Hiniker 9850 Operator's Manual

Pickup truck snowplow v-plow
Table of Contents

Advertisement

GENERAL INFORMATION
WARNING: To prevent personal injury
or death, be certain to keep clear of
any parts that may drop when remov-
ing bundling straps, wires or brackets. Sup-
port heavy sections with hoist or blocks be-
fore removing wires or straps.
In the following instructions, left and right ma-
chine references are defined as being viewed
from the cab of the truck.
Be certain that hydraulic hoses and electrical
wires are safely routed and allow full motion of
moving parts. Secure loose wires with plastic tie
straps.
Some components are fastened at incorrect lo-
cations for shipping purposes.
All hardware should be tightened only enough
to ensure safety during assembly. Torque hard-
ware to specified values, as shown in the fol-
lowing chart, only after assembly has been com-
pleted.
GRADE 5 TYPE B & F LOCK NUT
TORQUE VALUES
Size
Ft-lbs.
5/16"
3/8"
1/2"
5/8"
117-165
GRADE 5 BOLT TORQUE VALUES*
Size
Ft-lbs.
1/4"
3/8"
1/2"
73-103
5/8"
146-206
* applications without lock nuts
Replace
worn
bolts
grade 5 bolts and equivalent type B and type F
lock nuts. Type B lock nuts are plain hex; type F
lock nuts are flanged hex.
PLOW ASSEMBLY
N-m
13-18
17-25
23-33
31-44
58-82
79-112
158-223
N-m
8-12
11-16
29-41
39-56
99-140
198-279
and
lock
nuts
1.
Lift the snowplow moldboard assembly to
a clear level working area by hooking hoist
chains through the two holes in the top plate of
the center mast. The hoist should be capable
of lifting at least 1,000 lb. loads.
Remove two side markers and 5/16 inch hard-
ware from the top of the moldboard, and set
aside for assembly later. Save two sets of 5/16
inch hex bolts, flat washers and lock nuts from
the shipping brackets for assembling the side
markers.
2.
Open the frame crate and set aside the power
unit box, headlamp boxes and parts boxes for
later assembly. Remove the frame assembly
from the shipping crate to a piece of cardboard
or other padding that will prevent scratches in
the paint.
Locate the 3/4 inch x 4-1/4 inch hex bolt, 3/4
inch nylon insert lock nut and one 90
flare hydraulic fitting in the hardware bag in
the parts box.
Install the O-ring end of the 90
lift cylinder port so that the flared end points
toward the rod end and is directed down about
O
20
from the cylinder centerline to provide
clearance for installing the hose later.
with
Swing the lift frame up to its working position
and hold with a hoist or forklift. Bolt the upper lift
V-Plow Assembly 13
PLOW ASSEMBLY
fitting into the
O
DWG. NO. 6009
O
O-ring/

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9950

Table of Contents