Tools And Materials Required; Step 1: Remove The Packaging - GE Monogram ZV750 Installation Instructions Manual

36" vent hood
Hide thumbs Also See for Monogram ZV750:
Table of Contents

Advertisement

Tools &
• Tape measure
• Knife
Materials
• Spirit level
Required
• Wire cutter
(not supplied)
• Wire stripper
• Wire nuts
• Electric drill and appropriate bits
• Phillips screwdriver
• Flat blade screwdriver
• Hammer
• Pliers
1
The vent hood is shipped secured to a shipping
board with 4 screws.
• Remove the duct cover, parts box and
S tep
styrofoam packaging.
Remove the
• Lift the hood out of the box, using hand grips
on both sides of the shipping board.
Packaging
• Remove and properly discard the plastic
wrapping.
• Locate and remove 2 screws at the top of the
assembly and 2 screws inside the hood behind
the filter guides on the left and right sides.
Discard the shipping board.
• Remove junction box cover.
• Remove knockout from junction box.
• Install strain relief onto junction box.
6
Knockout
Mounting Screw
Sh ip pi ng Bo ar d
Installation Preparation
• Safety glasses
• Tape to mount template
• Gloves to protect against sharp edges
• 120V 60Hz. 15 or 20 Amp, 2 wire with
ground. Properly grounded branch circuit.
• Strain relief for junction box.
• 6" round metal duct work.
Junction
Box
Mounting
Screw
S h ip p in g B o a
36" Vent Hood
Mounting
rd
Screw

Advertisement

Table of Contents
loading

Table of Contents