Tools And Materials Required; Step 1: Remove The Packaging - GE ZV750 Installation Instructions Manual

36" vent hood
Hide thumbs Also See for ZV750:
Table of Contents

Advertisement

• Tape measure
Tools &
• Knife
Materials
• Spirit level
• Wire cutter
Required
• Wire stripper
(not supplied)
• Wire nuts
• Electric drill and appropriate bits
• Phillips screwdriver
• Flat blade screwdriver
• Hammer
• Pliers
1
The vent hood is shipped secured to a shipping
board with 4 screws.
• Remove the duct cover, parts box and styro-
S tep
foam packaging.
• Lift the hood out of the box, using hand grips
Remove the
on both sides of the shipping board.
Packaging
• Remove and properly discard the plastic
wrapping.
• Locate and remove 2 screws at the top of the
assembly and 2 screws inside the hood behind
the filter guides on the left and right sides.
Discard the shipping board.
• Remove junction box cover.
• Remove knockout from junction box.
• Install strain relief onto junction box.
6
GE Monogram at
Call 1-800-667-8721 anywhere in the US and Canada
Junction
Box
Knockout
Mounting Screw
Sh ipp ing Bo ar d
::
com
.
rangehoods
Installation Preparation
• Safety glasses
• Tape to mount template
• Gloves to protect against sharp edges
• 120V 60Hz. 15 or 20 Amp, 2 wire with
ground. Properly grounded branch circuit.
• Strain relief for junction box.
• 6" round metal duct work.
Mounting
Screw
S h ip p in g B o a
rd
kitchen
is a division of
U
N
L
-
36" Vent Hood
Mounting
Screw
accessories
::
I
M
I
T
E
D
www.rangehoods.com

Advertisement

Table of Contents
loading

Table of Contents