Page 1
GE Monogram ® Installation Instructions 36" Vent Hood Model ZV750...
Page 2
FOI_LOWING: If wm have questions concerning the installa- A. Use this trait only in the rammer intended tion of this product, call the GE Answer Center °' Consmner Intormation Service at bv the mamlthcturer. If you have arJy q ues-...
36" Ve_t Hood Model This xent hood is designed to be used in Model xented installations. ZV750 Available A decorative duct coxer is proxided to coxer the duct fl'on_ the top of the hood to an S ti. or 9 ft. ceiling.
Page 4
Design Infi)rmation 36" ge_t Hood Ductwork Advance • Determine tile exact location of tile vent hood. Plannin, g • Plan tile route for venting exhaust to tile outdoors. • Use tile shortest straightest duct route possible. For satistactory perflwmance, duct should not exceed 100 feet equivalent...
24 ft. *Actual length of straight duct plus duct fitting Total Duct equivalent. Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineer- ing and reflect requirements for good venting performance with any ventilation hood.
Page 6
Installation Preparation 36" V_,_I Hood • Salety glasses 7bots & • Tape measure • Tape to mount mmplate • I0aife Materials • Gloves to protect against sharp edges • Spirit level • 12(W 60Hz. 15 or 20 _Mnp, 2 wire with •...
Page 7
Installation 36" Ve_t Hood Locate the hardware accessory box packed with range hood check contents. 2 Large Wall (/heck Flat Washers Fasteners hl,stallation 2 Mounting Hardware Wood Screws Decorative Duct Brackets Cover 2 PhillipsHeadScrews UtilityBarswith Screws 3 Filters Wall Mount Template To determine ductwork locations:...
Installation 36" Ve_t Hood Whenever possible, the vent hood should secured to wall studs. 2 e_ *With the template taped in place, use a hi, stall punch to mark all mounting screw locations. • Drill 1/8" pilot holes at tile 6 punched Mounting locations.
Page 9
Installation 36" Ve_H Hood • Install 2 small screws into sides of the duct bracket. Remoxe scre_s. This will insm'e ease of final installation. • Temporarily install a piece of 6" duct Install Duct length bet_een hood outlet ductwork at the ceiling.
Page 10
Installation 36" Ve_t Hood Do not sheet metal screws at hood flange connection, Doing so will prevent proper Duct Tape damper operation, Seal connection with Over Seam Connect tape only. Screw Ductwork • Install ductw()rk, making com_ections direction of airflow as illustrated.
Page 11
Installation 36 _' Ve_l Hood hl, stall Filter:s • Remove protective film on filters. • To relnove filters, grasp knob • Tip filter into lower slots at the rear push filter towards rear tilt downwards. of the opening, lift the filter pull knob...
Page 12
49-8990-1 N()TE: P:oauct implovemenl is _ containing endeavo: _I Gene_ Dwg. N_}. 164D3333P214 Monogram: Electric¸ Theret_>re. malerials, appearance _pecificalions (0 2000 GE Appli;m(es (N.D. 6] 2) 5/00 sul_iecl Io change wilhom nolice Printed in Italy General Electric Company Louisville, KY40225...
Need help?
Do you have a question about the Monogram ZV750 and is the answer not in the manual?
Questions and answers