Carrier 40UV Installation, Start-Up And Service Instructions Manual page 58

Unit ventilators with product integrated control (pic)
Table of Contents

Advertisement

13
14
12
11
NOTES:
1. Not all components shown for clarity.
2. This drawing applies to 2000 cfm units only.
3. Remove shaft, motor and coupling prior to removing bearing.
Refer to Ball Bearing Replacement instructions.
4. Install sleeve bearing with oil cup facing up and towards the rear of
the assembly.
5. Refer to Fig. 36 for motor-coupling and shaft-coupling tolerances.
10
9
8
Fig. 40 — 40UH200 Ventilator Blower Drive Train Assembly
1
(SEE NOTE 5)
(SEE NOTE 5)
(SEE NOTE 4)
58
2
3 4
5
7
UNIT
BOTTOM
LEFT SIDE
VIEW
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents