Placing Into Operation; Switch On; Initial Operation - Platinum 13000 TL Installation And User Manual

Table of Contents

Advertisement

4

Placing into operation

4.1 Switch on

4.2 Initial operation

▪ To transfer all settings correctly, initial operation must be conducted in
full once.
▪ When installing several inverters that are linked with each other via the
PLATINUM® network (eIA485), initial operation can be performed on
any inverter (master programming). for this to be possible, all inverters
in the network must be switched on.
▪ The inverter automatically transfers the setting values to the other
inverters via the PLATINUM® network (eIA485).
▪ every inverter is allocated a number automatically during initial
operation. This number can be changed and freely assigned in a further
step.
▪ The inverters on which no data is entered display different screen
content depending on the menu. If data cannot be entered, the
inverter displays the start screen.
▪ During initial operation, all inverters connected to the
PLATINUM®network are blocked.
Installation and user guide for inverter PLATINUM® 13000 TL, 16000 TL, 19000 TL, 22000 TL, 22001 TL
1. Switch on mains voltage supply (safety device).
2. Switch on the DC voltage via the 3 DC
disconnects on the underside of the device or via
the external isolation device.
The inverter type appears on the display along
with the prompt STArT?.
Placing into operation
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

16000 tl19000 tl22000 tl22001 tl

Table of Contents