AC INPUT
AC Power Source
CB-1
Hot
Hot
5
Neutral
Ground
External DC Power
Source
Ground
CB-2
(30A)
Positive
Negative
Neutral
BATTERY INPUT
NOTES:
1
All switchgear and connections outside of the UPS must be supplied by the
customer. The National Electrical Code requires that an overcurrent and a disconnect
device (provided by the customer) must be installed between the UPS and the AC input.
The National Electrical Code requires that a distribution system which contains an
2
overcurrent and a voltage disconnect device (provided by the customer) must be
installed between the UPS and the external DC source.
See Interface Ports later in this section for details about the User Interface
3
Connectors.
4
The National Electrical Code requires that an overcurrent and a disconnect device
(provided by the customer) must be installed between the UPS and the load.
Use for two-phase models only. Terminal is not connected on one-phase models.
5
UPS
(Field-Wired Models)
1
IL1
Line 1
Line 2
IL2
Neutral
IL3(N)
Ground
2
(+)
(–)
N
Optional
Recep.
Plates
5-15R Duplex
JL1
JL2
Line 1
OL1
Line 2
OL2
5
Neutral
OL3(N)
Ground
J2
Serial Comm. Port (Std.)
J3
Dry Contacts (Std.)
TB1
REPO (Std.)
JA
J3O
Modem Port (Option)
JB
J4
JC
Start On Battery (Option)
4
3
Need help?
Do you have a question about the Continuous Power Series and is the answer not in the manual?