Module Installation (6-Port) - Paramount Fitness PCC2000 Owner's Manual

Cleaning system manual
Hide thumbs Also See for PCC2000:
Table of Contents

Advertisement

WATER VALVE INSTRUCTIONS

Module Installation (6-port)

1. Check the o-ring and groove for debris, and clean if necessary
(this is a quad ring and is almost square, the height is slightly big-
ger than the width).
2. Replace the o-ring (Part # 005-302-0100-00) if it is stretched or
damaged. The o-ring does not require any lubrication. Lubricating
o-ring can attract dirt and debris that could prevent it from seal-
ing. Never use petroleum jelly on plastic or rubber parts, as this
will damage them.
3. Set the module in the base and turn until the alignment pins on
the bottom of the module drop into the alignment holes in the
base (Figure 3).
4. The module should fit in the base without forcing it. If it does not
seat easily then check the following.
(Figure 3) shows the piston portion of the current module
design (released 06-2011). These pistons are set at the
factory. Do not touch, pull or turn these pistons. Any handling
will negatively affect the performance and fit of this product.
If the flow optimizer (Figure 4) prevents the module from
seating properly in the base you may have to remove it. To
remove optimizer press in on the 3 clips and pull to seperate.
9
(CONT.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents