™
Digital Energy
Static Transfer Switch
1
2
INTRODUCTION .......................................................................................................8
3
INSTALLATION ........................................................................................................16
4
OPERATION ............................................................................................................21
4.2.4 Return from secondary bypass mode to STS operation
4.3 Service
4.3.1 STS operation test
4.3.2 Main fuse exchange procedure
4.3.3 TVSS fuse exchange procedure
4.3.4 Trouble shooting
4.4 Parameter settings (dip switches)
4.5 Default dip switch settings
4.6 Terminals
4.6.2 Communication Interface Module CI-M1
5
SPECIFICATIONS ...................................................................................................43
OPM_STS_400_25A_100_1GB_V011
CONTENTS
2
GE DE STS: installation and operating manual 1.1 (GB)
g