INSTRUCTIONS
AND
RENEWAL PARTS
LOAD BREAK SWITCH
SE-100 E
SE -lOOM
SE-lOOS
CONTENTS
1
Introduction
• • • • • • • • • • • • • • •
1
Ratings
• • • • , • • • • • • • • • • • • • • •
Receiving,
HancUing
2
and Storage,
• • • • • • • • • , • •
Ins
.
..
3
Callation
..
..
.
.
.
.
. .
.
.
.
�scription of Operation
• •
& SE-1008
4
SE-lOOE
• • • • • • •
ll
SE-lOOM
. . . . . . . . . . . . . . . .
Adjustments
&
.
5
SE-100E
SE-1008
.
.
.
, • •
.
.
12
SE-1QQ;I,,,,
. . . .
, • • , • • •
1 3
.
Final Inspection .
.
.
. . .
. . ,
.
.. 15
Renewal Parts
...
...
.
. . .
.
Lubrication Chart ......... 16
Schematic Wiring Diagram
.
.
.
16
SE-lOOE
.
. .. . . .
. .
.
. . .
SWITCHGEAR PRODUCTS DEPARTMENT
GENERAL
ELECTRIC
fj
PHILADELPHIA, PA.
GEI-88767D
Supersedes
GEI-88767C

Advertisement

loading

Summary of Contents for GE SE-100E

  • Page 1 • • • • • • • SE-lOOM ....Adjustments & SE-100E SE-1008 , • • SE-1QQ;I,,,, .., • • , • • •...
  • Page 2 GEI-88767 BREAK SWITCH lOAD TYPE SE-100 INTRODUCTION The type SE-100 Load Break Switch is manually or electrically operated, triple pole disconnecting switch with an integral interrupter that has capability of interrupting transformer magnetizing and load currents within its rating. The SE-1003 has a manually charged, spring stored energy operating mecha­ nism capable of closing the switch against maximum rated short circuited current.
  • Page 3 GEI-88767 the incoming side of a power transform er, the primary bus1or to cables by the use of potheads . When applied with power fuses, the combinat ion serves as a successful switching and fault protection device. Operation of the switch is accomplish ed by manual rotation of a handle The SE-lOOS switch has a positive closing and through an arc of 180°.
  • Page 4 GEI-88767 The switch should be stored in a warm dry location to protect the insulation parts from condensation. The switch should be stored in a clean location free from corrosive gases or fumes. Particular care should be taken to protect the equipment from moisture and cement dust, as this combination has a very corrosive effect on many parts.
  • Page 5 GEI-88767 Check all items listed under Adjustments before the switch is put in operation and during each period of maintenance. DESCRIPTION OF OPERATION SE-lOOE AND SE-lOOS On the SE-lOOE and SE-lOOS switches both the closing and opening opera­ tion is accomplished by the spring-charged mechanism (6) Fig. 1 located on the front of the switch assembly.
  • Page 6 GEI-88 7 6 7 When the closing switch contacts are made the start-stop relay (3) Fig. will close contacts and energize the motor in the proper direc­ tion. At the same time a closing seal-in relay assures a complete operation without hesitation and mades the closing of the SE-lOOE switch independent of the operator.
  • Page 7 GEI-88767 Remove the rear bolt from position (lA) of the spring stop (2) located on the upper right angle frame. On 1200A switches it may be necessary to loosen the front bolts of the right hand barrier to have access to the bolts. Rotate the stop until it is vertical, replace the bolt that had been removed in the lower location (1) and tighten.
  • Page 8 GEI-88767 Ther� should also be and the primary blade buffer stop (1) Fig. 1. 3/16" to 1/4 between the edge of the primary blade and the front of the primary contact support. Adjust the length of the rod by use of the adjusting nuts Fig.
  • Page 9 GEI-88767 (10) Fig. 7 at the bottom of the chute. Position the chute so that the blade will travel the full length without binding or heavy scrap­ ing, and tighten the bolts. A dimension of 1-1/6" should be maintained from the rear edge of the arc chute to the front edge of the primary finger contact support at all times when moving or re-aligning the chute.
  • Page 10 GEI-88767 with a spring scale against the contact surface. Loosen or tighten the contact bolts (7) Fig. 8 as necessary. The correct hinge pressure is essential for proper operation of the switch. The hinge pressure is difficult to measure, but a required torque to move the primary blades can be easily measured and can be substituted for a,pressure measurement.
  • Page 11 GEI-88767 LUBRICATION In order to maintain reliable operation, it is important that all parts of the mechanism be properly lubricated at all times. All bearings and other parts of the mechanism subjected to wear have been properly lu­ bricated, during assembly at the factory, using the finest grades of lubricants available.
  • Page 12 GEI- 88767 able to leave the bearings in the alcohol for a lo�er time, an in­ hibited alcohol such as is used for anit- freeze should be used. Even then the bearings should be removed from the alcohol within twenty­ four hours.
  • Page 13 GEI-88767 ADJUSTMENTS SE-lOOM Mechanism Stop Refer to Page 6. Primary Wipe When the switch is in the closed position, there should be no clearance between the primary blades and the primary finger support. The length of the operating rod should be adjusted so that there is noticeable force involved when the operating rod goes over center near the end of the closing stroke.
  • Page 14 GEI-88767 The SE-lOOM hook release should be adjusted to release the auxiliary blade when the primary contacts and blade are 1/2" 1" apart. Be certain the auxiliary blade latches into the arcing contacts in the chute on each operation. The auxiliary blade is released before the primary c0ntacts are closed so that it will close first and give a positive closing action even when the switch is inadvertantly op­...
  • Page 15 GEI-88767 are made all organic insulating materials should be inspected ror visible leakage current paths, and necessary action must be taken to replace insulation that may have been affected by moisture absorption. The high potential test is also recommended for devices which have been removed from service and stored over an extended period of time under unfavorable atmospheric conditions.
  • Page 16 RECOMMENDED RENEWAL PARTS CAT. NO. QUAN. DESCRIPTION RATING SE- lOOE SE-lOOS SE- lOOM Primary Contact Finger 121A7458 P-2 121A7458 P-2 121A7458 P-2 Primary Contact Finger 1200 161A4219 P-2 161A4219 P-2 Not Avail. Primary Contact Spring 456A806 456A806 456A806 Not Avail. Primary Contact Spring 1200 456A806...
  • Page 17 GEI-88767 LUBRICATION AT NORMAL ALTERNATE LUBRICATION PART MAINTENANCE PERIOD Sleeve Bearings Light application of Clean bearings then Operating rod ends SAE 20-30 oil apply D50Hl5 grease. Aux . Blade Hinge, Release Hook, etc. Clean bearings then Roller Needle Light application of &...
  • Page 18 GEI-88767 Primary Blade Stop Primary Contact Fingers Primary Contact Blade Primary Spring Booster Spring Oper atin g Mech anis m Opera ting Hub Fig. 1 SE-lOOS Switch Partially O pen Spring Stop Bolt Spring Stop Bolt Spring Stop Driving Crank Hole for Spring Blocking Pin Driving Lug...
  • Page 20 GEI-88767 Collar Buffer Rubber upper Buffer Stop Booster Crank Buffer Rubber Lower Buffer Stop Fig. 5 Buffer Assembly Auxiliary Blade Spring Auxiliary Blade Release Hook Spring Stop Carruning Screw Lock Nut Adjusting Nut Release Hook Spring Operating Rod Operating Rod Crank Main Crank Shaft Fig.
  • Page 21 GEI-88767 Fig. unit Pole Closing Butter Stop Arc Chute Mounting Bolts Shims �: Contact Bolt Primary Contact Fingers Arcing Contact Fingers Fig. 8 Contact Arrangement Auxiliary Blade Buffer Stop Guide Block Arc Chute Mounting Bolts .• Arc Chute Mounting Bolts Upper Terminal Primary Contact Blade Shims...
  • Page 22 GEI-88767 Arc Chute Stationary Primary Contact Primary Blade Stop Primary Blade Fig. 9 Unit Pole Fully Open 4 . . Close Relay 1. Auxiliary Switch 5. Open Relay 2. Motor 3. Start-Stop Relay Fig. 10 Electrical Operator...
  • Page 23 .. 615 Indianola Ave. E. M1chigan St. GENERAL ELECTRIC SERVICE SHOPS WHEN YOU NEED SERVICE . . . These GE Service Shops will repatr, re­ ises. Latest factory methods and genuine GE renewal parts are used to condition, and rebuild your electric apparatus. The facilities are available maintain performance of your equipment.

This manual is also suitable for:

Se-1oomSe-1oos