Maintenance
92
Remount the motor.
Tighten the four screws under the machine.
Carefully put the new drum package back in the machine.
Fasten the support rollers at the front of the machine.
Connect the RMC and the "FREE" connection if disconnected.
Connect the wires and mount the cover panel to the electrical connections.
Fasten the four screws at the panel around the heating element and the rest of the screws on
the panel.
Fasten the belt. Rotate the drum to make sure that the belt is in position.
Mount the air channel panel. On condense machines: Refit the hose before mounting the air
channel panel.
Connect the overheating thermostat and the heating sensor.
Mount the top panel, the cover panel at the air outlet and the casing over the rear panel.
13.5 Check the belt
Check that both of the belts are not worn out. Replace if necessary.
T5130
T5130C
fig.7522A
98