Installation
Cable Sizes and
Current
12
The following table indicates the recommended sizes of conductors in accordance with the NEC
temperature surrounding the conduits not greater than 104°F (40°C).)
NOTE: Cable sizes are suggested and based on standard configurations. Installers should verify correct
conductor sizes pursuant to NEC
®
runs, consult NEC
and/or state or local codes to account for electrical losses.
Table 4. Cable Sizes
Term ID
Description
JL1
Line 1 (Jumper)
JMP
JL2
Line 2 (Jumper)
ML1
Line 1 (Main)
MAIN
ML2
Line 2 (Main)
E/G
Chassis Ground
BL1
Line 1 (Bypass)
BYPASS
BL2
Line 2 (Bypass)
E/G
Chassis Ground
X1
Output Term 1
X2
Output Term 2
X3
Output Term 3
‡‡
OUTPUT
E/G
Chassis Ground
X4
Output Term 4
X5
Output Term 5
X6
Output Term 6
‡ Wire between JL1 & BL1 and between JL2 & BL2 if only single input power source is used.
‡‡ Output voltage available at output terminals dependent on specific model. See Table 5 - 7 on page 13 for details.
* Use insulated copper wire rated 90°C minimum
** Must be no smaller than wire connected to L1 and L2
NOTE: For installation per IEC regulations : If installing units per regulations IEC-287 and DIN VDE 0298, 6 kVA model
should be wired (inputs and outputs) with 6 mm
2
wired with 10 mm
cable torqued to 2.5 nt-m. (Based on 90°C cable and ambient of 40°C)
®
and/or state or local codes. If the installation requires long conductor
6 kVA (4 kVA)
main wire
term torque
gauge (awg
(in-lbs)
‡
8
22
‡
8
22
8
22
8
22
**
22
8
22
8
22
**
22
10
22
10
22
10
22
10
22
10
22
10
22
10
22
2
cable torqued to 2.5 nt-m; and 10kVA model (inputs and outputs) should be
ONEAC Sinergy SE II Series UPS User Manual
10 kVA (8 kVA)
min wire
main wire
term torque
*
gauge (awg
(in-lbs)
temp (°C)
90
6
22
90
6
22
90
6
22
90
6
22
90
**
22
90
6
22
90
6
22
90
**
22
90
6
22
90
6
22
90
6
22
90
6
22
90
6
22
90
6
22
90
6
22
®
. (Air
min wire
temp (°C)*
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90