Vent Termination Below Grade

Install Snorkel Kit #7FSDVSKS when it is not possible to
meet the required vent termination clearances of 12" (305
mm) above grade level. The snorkel kit will allow instal-
lation depth of down to 7" (178 mm) below grade level.
The seven inches is measured from the center of the hori-
zontal vent pipe as it penetrates the wall. If the venting
system is installed below grade, a window well must
be installed with adequate and proper drainage. (Fig.
29)
Wall Screws
and Anchors
Snorkel
Termination
Cap
4"
Drain
Window Well
Fig. 29 Snorkel kit installation.
NOTE: Be sure to maintain side wall clearances and vent
run restrictions. Refer to Figures 5, 6, 7, and 8.
1. Establish the vent hole through the wall.
2. Remove soil to a depth of approximately 16" (400mm)
below the base of the snorkel. Install a window well
(not supplied). Refill the hole with 12" (305mm) of
coarse gravel and maintain a clearance of at least 4"
(102 mm) below the snorkel. (Fig. 33)
3. Install the vent system as described on Pages 15-18.
4. Be sure to make a watertight joint around the vent pipe
joint at the inside and outside wall joints.
5. Apply high temperature sealant around the inner and
outer snorkel collars. Join the pipes and fasten the
snorkel termination to the wall with the screws provid-
ed.
6. Level the soil to maintain a 4" clearance below the
snorkel.
If the foundation is recessed, use extension brackets
(not supplied) to fasten the lower portion of the snorkel.
Fasten the brackets to the wall first, and then fasten
to the snorkel with self-tapping #8 x 1/2" sheet metal
screws. Extend the vent pipes out as far as the pro-
truding wall face. (Fig. 30)
30004968
Waterproof Seal
Around PIpe
Firestop
ST218a
ST218
install snorkel
12/6/99 djt
Stardance® Direct Vent/Natural Vent Gas Heater
Recessed Wall
Sheet Metal
Screws and
Bracket
Wall Screws and
Anchor
Waterproof Seal
Around Pipe
Fig. 30 Use extension brackets to mount snorkel against
recessed wall.
Vertical (Through the Roof)
ST219
Vent Assembly
snorkel detail
Note that all vertically terminated installations must
12/6/99 djt
include the restrictor plate included with the stove.
Refer to Page 9, Figure 8.
Make certain the vent system conforms to all other re-
quirements for vertical termination as specified on Page
8.
This installation will require you to first determine the roof
pitch and use the appropriate vent components. Refer to
Pages 9 and 11, Figures 8 and 11.
1. Locate the final position of the stove, observing all
clearances for both the vent and the stove.
2. Plumb to the center of the inner (4") flue collar from the
ceiling above, and mark that location.
3. Cut the opening:
Vermont Castings Group System:
9C\₈" x 9C\₈" (240 x 240mm)
DuraVent System: 10" x 10" (254 x 254mm)
4. Plumb any additional opening through the roof or oth-
er construction that may be needed. In all cases, the
opening must provide a minimum of 1" (25 mm) clear-
ance to the vent pipe.
5. Place the stove in its final position.
6. Install firestop(s) #7DVFS and Attic Insulation Shield
#7DVAIS as needed. (Fig. 31) If there is a room above
ceiling level, a firestop must be installed on both the
bottom and top sides of the ceiling joists. If an attic is
above ceiling level, an attic insulation shield must be
installed.
7. Install the appropriate roof support and flashing, mak-
ing certain that the upper flange of the flashing base is
below the shingles. (Fig. 32)
8. Install appropriate pipe sections until the vent run
reaches above the flashing. The enlarged ends of the
Firestop
Finishing Collar
7" Pipe
Wall Plate
ST219
19