A+ Server 1022TC-IBQF/1022TC-TF User's Manual
2-5
Checking the Serverboard Setup
After you install the server in the rack, you will need to open the top cover to make
sure the serverboard is properly installed and all the connections have been made.
Accessing the Inside of the System (Figure 2-5)
To access the system, first grasp the two handles on either side and pull the system
straight out until it locks (you will hear a "click").
1. Disconnect the chassis from any power source and remove all four screws.
2. Gently push down on the chassis cover in the areas indicated in the
illustration.
3. Push the cover toward the rear of the chassis
4. Lift the cover upwards and off the chassis.
5. To remove the system from the rack completely, depress the locking tabs in
the chassis rails (push the right-side tab down and the left-side tab up) to
continue to pull the system out past the locked position.
Figure 2-5. Accessing the Inside of the System
1
2
Remove
1
4
1
2
2-8
Remove
1
3
Remove