Ul Guidelines; Mounting Instructions - Extron electronics MPX Plus 866 A User Manual

Media presentation matrix switcher
Hide thumbs Also See for MPX Plus 866 A:
Table of Contents

Advertisement

Installation
Mounting the Switcher

UL guidelines

The following Underwriters Laboratories (UL) guidelines pertain to the installation
of the MPX switcher into a rack (figure 2-1).
1.
2.
3.
4.
5.

Mounting instructions

If desired, rack mount the switcher as follows:
1.
2.
Figure 2-1 — Installing the switcher in a rack
2-2
MPX Plus 866 A Media Presentation Matrix Switcher • Installation
Elevated operating ambient temperature — If installed in a closed or
multi-unit rack assembly, the operating ambient temperature of the rack
environment may be greater than room ambient. Therefore, consider
installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by Extron.
(+40 °C)
Reduced air flow — Installation of the equipment in a rack should be such
that the amount of air flow required for safe operation of the equipment is not
compromised.
Mechanical loading — Mounting of the equipment in the rack should be such
that a hazardous condition is not achieved due to uneven mechanical loading.
Circuit overloading — Consideration should be given to the connection of the
equipment to the supply circuit and the effect that overloading of the circuits
might have on overcurrent protection and supply wiring. Appropriate
consideration of equipment nameplate ratings should be used when
addressing this concern.
Reliable earthing (grounding) — Reliable earthing of rack-mounted
equipment should be maintained. Particular attention should be given to
supply connections other than direct connections to the branch circuit (e.g. use
of power strips.
Insert the switcher into the rack, aligning the holes in the mounting bracket
with those in the rack (figure 2-1).
Secure the switcher to the rack using the supplied bolts.
104 °F

Advertisement

Table of Contents
loading

Table of Contents