Dedicated Ilo Management Port Option - HP ProLiant ML110 G7 User Manual

Table of Contents

Advertisement

Install the expansion board.
9.
Connect any required internal or external cables to the expansion board. See the documentation that
10.
ships with the expansion board.
If installing a full-length expansion board, install back the board retainer.
11.
Install the air baffle (on page 22).
12.
Install the access panel (on page 21).
13.
Lock the tower bezel.
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Power up the server (on page 19).
17.

Dedicated iLO management port option

NOTE:
To install the component:
Power down the server (on page 19).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Unlock the tower bezel
3.
Remove the access panel (on page 21).
4.
Depending on model purchased, the server may look slightly different than shown.
("Unlock and open the tower
bezel" on page 20).
Hardware options installation 50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents