Installing The Trusted Platform Module Board - HP ProLiant ML110 G7 User Manual

Table of Contents

Advertisement

Installing the Trusted Platform Module board

WARNING:
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.
WARNING:
internal system components to cool before touching them.
Power down the server (on page 19).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Unlock the tower bezel
3.
Remove the access panel (on page 21).
4.
Remove the rear system fan.
5.
CAUTION:
the TPM security rivet. Upon locating a broken or disfigured rivet on an installed TPM,
administrators should consider the system compromised and take appropriate measures to ensure
the integrity of the system data.
To reduce the risk of personal injury, electric shock, or damage to the equipment,
To reduce the risk of personal injury from hot surfaces, allow the drives and the
("Unlock and open the tower
Any attempt to remove an installed TPM from the system board breaks or disfigures
bezel" on page 20).
Hardware options installation 53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents