Fujitsu PRIMERGY BX920 S3 Operating Manual page 28

Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

Important Information
Before starting up
V
CAUTION!
During installation and before operating the device, observe the
instructions on environmental conditions for your device (see
specification" on page
If the server has been moved from a cold environment, condensation
may form both inside and on the outside of the machine.
Wait until the server has acclimatized to room temperature and is
absolutely dry before starting it up. Material damage may be caused
to the server if this requirement is not met.
Only transport the server in the original packaging or in packaging
that protects it from impacts and jolts.
Installation and operation
V
CAUTION!
The device may only be operated in a maximum ambient temperature
of 35°C.
If the device is integrated in an installation that receives power from
an industrial (public) power supply network with the IEC309
connector, the (public) power supply protection must comply with the
requirements for non-industrial (public) power supply networks for the
type A connector.
The On/Off button or the main power switch (if there is one) does not
disconnect the device from the mains voltage. To completely
disconnect it, you must remove all the power plugs from the power
outlets.
Data cables must be adequately shielded to avoid interference.
Do not connect or disconnect any data transmission cables during a
thunderstorm (lightning hazard).
Make sure that no objects (e.g. bracelets or paper clips) fall into or
liquids spill into the device (risk of electric shock or short circuit).
28
20).
Operating Manual
"Server
BX920 S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents