Westerbeke 5.5 kw EDC 60 HZ Operator's Manual page 6

Marine diesel generators, single phase
Table of Contents

Advertisement

INSTALLATION
When installing WESTERBEKE engines and generators it is important t)1at strict
attention be paid to the following information:
CODES AND REGULATIONS
Strict federal regulations, ABYC guidelines, and safety codes mnst be complied with
when installing engines and generators in a marine environment.
SIPHON-BREAK
For installations where the exhaust manifold/water injected exhaust elbow is close to
or will be below the vessel's waterline, provisions must be made to install a siphon-
break in the raw water supply hose to the exhaust elbow. This hose must be looped a
minimum
of
20" above the vessel's waterline. Failure to use a siphon-break when
the exhaust manifold injection port
is
at or below the load waterline will result in
raw water damage to the engine and possible flooding of the boat.
If you have any doubt about the position of the water-injected exhaust elbow relative
to the vessel's waterline under the vessel's various operating conditions, install a
Siphon-break.
NOTE: A siphon-break requires periodic inspection and cleaning
to
ensure proper
operation. Failure
to
properly maintain a siphon-break can result in catastrophic
engine damage. Consult the siphon-break manufacturer for proper maintenance.
EXHAUST SYSTEM
The exhaust hose must be certified for marine use. The system must be designed to
prevent water from entering the exhaust under any sea conditions and at any angle
of the vessels hull.
A detailed 40 page Marine Installation Manual covering gasoline and
diesel engines and generators is provided with each unit sold. Additional
copies can be obtain off our website in pdf form. www.westerbeke.com
....v: WESTERBEKE
Engines
&
Generators
iv
AVAILABLE FROM
YOUR WESTERBEKE
DEALER

Advertisement

Table of Contents
loading

This manual is also suitable for:

5.0kw edc 50 hz

Table of Contents