Glass Door Assembly; Blower Installation - Quadra-Fire Direct Vent Room Heater CASTILE-GAS-CSB Owner's Manual

Castile gas stove direct vent room heater
Table of Contents

Advertisement

I. Glass Door Assembly
Turn the appliance OFF and let it cool down before
Figure 8.15
replacing the inner glass door assembly.
Remove the glass door assembly by opening latches at the
bottom front of the appliance, on both the left and right sides.
Lift out and away from the appliance.
Replace with a new glass door assembly.
NOTE: The glass, gasketing, and frame must be replaced
as a complete unit as supplied by the manufacturer.
Do NOT use substitute material.
CAUTION
Handle glass assembly with care.
• Inspect the gasket to ensure it is undamaged.
• Inspect the glass for cracks, chips or
scratches.
• Do NOT strike, slam or scratch glass.
• Do NOT operate appliance with glass door
removed, cracked, broken or scratched.
• Replace glass assembly as a complete
assembly.
Page 32
J. Blower Installation
FROM THE KIT YOU WILL NEED: Blower motor; wire
harness; rheostat; rheostat nut; knob; screws; and 1 zip-tie.
FROM THE STOVE COMPONENT BAG YOU WILL
NEED: snap disc bracket and 5/16 in. nut.
TOOLS REQUIRED: #2 Phillips head bit; hand drill; 11/16
in. wrench; and a 5/16 in. wrench.
Figure 8.16
remove the rear shield. Remove the blower from packaging.
Place the blower under the appliance. Attach the blower
from the front with four screws to the blower bracket.
Figure 8.17
bracket to the firebox with a 5/16 in. wrench.
Figure 8.18
disc.
Quadra-Fire · Castile Gas Stove · 7023-111E
Turn off gas supply (if gas is connected), and
5/16" nut
Snap disc
through bracket
Install the snap disc in the bracket. Attach the
Connect the electrical connector to the snap
September 1, 2008

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents