68 Installation/Mounting
the Dish
POLE MOUNT
Material
List:
•
1 EA. 1 1/4" ID
Schedule 40 galva-
nized steel pipe (1-
1/20D).
•
3 Bags quick
setting concrete.
•
1 EA. 1 l/2" Ground
clamp.
•
1 EA. Ground rod
•
1 EA. Ground rod
clamp.
•
Ground Conductor
(NO. 10 copper or
NO. 8 aluminum).
•
Wire ties.
Tool List:
•
Hole digging tools.
•
Hammer.
•
Wheelbarrow.
•
Bubble level or
plumb line.
•
Assorted box or
open end wrenches.
•
Screwdriver.
•
Pencil.
]k
St
_L
1 1/4
I.D.
SCH40
CLAMP
GROUND
ROD
,-
,_
lr
o
o
o
p_o
o_c
p o 'd
I_o
c
o
,,d ._° o
_ I_. b.,
32"
26"
MIN
4.
.11
8"
¶r
Figure 52, Pole Mounting DSS Dish